GENERAL SERVICES DIVISION

Final Inspection

The Final Inspection Section provides an internal “check-and-balance” system to ensure that construction and inspection are performed in accordance with the provisions of each contract.

This Section performs Final Inspections on each project awarded by the Board of Public Works as well as all “B” Permits issued by the Bureau of Engineering.

It is the Final Inspector who is responsible for ensuring that all corrective work has been completed, for establishing and maintaining the standard of acceptance on all City construction projects, and for establishing the Date of Final Field Acceptance for cash contracts and the Completion Date for “B” Permits.


FINAL INSPECTION IN METRO LOS ANGELES / HARBOR / SPECIAL PROJECTS

Lubie Carovski



(213) 847-2456

Tom Dam



(213) 847-2455


FINAL INSPECTION IN VALLEY AREA / WASTEWATER FACILITIES

Paul Thomas



(818) 756-9990
(818)374-1194